Tampilkan postingan dengan label small rooms and big problems. Tampilkan semua postingan
Tampilkan postingan dengan label small rooms and big problems. Tampilkan semua postingan

Kamis, 20 Desember 2012

Redoing the Hallway


Mr. Wonderful looked at the hallway quietly.
“It’s small,” I said standing behind him.
He touched the walls silently. 
“So painting it will go fast,” I said grabbing a paintbrush.
He knelt to examine the baseboard wordlessly.
“Imagine,” I said, “redoing a room in just one afternoon!”
“Shhh, don’t jinx it!”


Unfortunately I spoke too soon.  The hallway in question was tiny, consisting of more open doorways than solid walls so I had sky-high hopes of redoing it quickly.  I was hoping remodeling it would be described as “short and sweet” or “done in a snap”!  Instead it was “Welcome to Hell”.

When we moved in the entire hallway was painted a shade I could only describe as puke tan/brown—the walls—and ceiling—all of it was puke tan/brown.  It was as if a dog caked in mud, puke and excrement had shaken itself dry in the hallway.  It was a depressing space too reminiscent of gross bodily functions and had to go!  We redid it in a few steps:

Step 1: Remove paint.  When we removed the puke colored paint we discovered a layer of wallpaper.  It’s not unusual to paint over wallpaper, it just means more work for the re-doers.  Which lead to…
Step 2: Remove the wallpaper and find plaster.  Discovering the plaster meant we’d reached the end of scraping off paint!  Yippee!
Step 3: Sand down the plaster to smooth it out.  When—lo and behold—under the plaster we discovered a second layer of wallpaper.  Plastering over wallpaper was highly unusual, undeniably lazy and completely wacko.
Sooo Step 4: Collapse on the sofa and cry ourselves to sleep.
Step 5: Wake up, drink coffee and prepare for another full day of work on this X%&#$ space.
Step 6: Drink more coffee.  Then suck down three triple espressos.
Step 7: Scrape off the plaster—and the paper stuck to it—all the while cursing the people who did this.  In our zeal to remove the plaster+paper combination we also scraped off plastered chunks of wall, thereby turning our solid walls into Swiss cheese. 
Step 8: Cry some more. 
Step 9: Realize this project gets worse with each passing hour.
Step 10: Remember the original puke tan/brown walls as being highly attractive.  “What an ironic comment on human society to have puke colored walls.  Why did we ever remove it?!”
Step 11: When arms ache from scraping, tumble into bed with a bottle of Advil.
Step 12: Go to work after a weekend of “relaxing” in The House.
Step 13: Smile all week as your friends tell you how lucky you are to be a homeowner.
Step 14: Embrace the new weekend and plastering.  Big whoop.  We mixed plaster and covered the walls and ceilings in a fresh coat of plaster that looked as creamy as cake icing—without the calories.
Step 15: Sand down this coat of plaster.  Once dry, apply a second coat of thinner plaster to smooth out the entire surface.
Step 16: PAINT.  Twice.  Walls and ceiling.
Step 17:  Hang picture frames. 
Step 18: Weep with joy at competing this redo!

Yes, the smallest room in the house took the largest amount of scraping, elbow grease and struggle.  A process I could best describe as “Small and Fighty”.  With this project we went to hell—and back—and the red walls remind me of our journey.  I look at them with a source of pride.  I’m a survivor!

The redo taught me—the hard way—to avoid talking about the ease with which we could do projects in The House.  Although the bathroom is such a small room, I bet we could redo that by lunchtime!